High Tunnel Gantry Preliminary Design

Project Type: Partnership
Funds awarded in 2021: $29,944.00
Projected End Date: 03/31/2024
Grant Recipient: Rigorous
Region: Northeast
State: Vermont
Project Leader:
Description:
The conceptual designs for the high tunnel gantry, transport cart, and automated row cover system.
Type:
Conference/Presentation Material
File:
Authors:
Diane Abruzzini, Rigorous; Colin Riggs, Rigorous
Target audiences:
Farmers/Ranchers; Educators
Ordering info:
https://www.rigorous.co
Diane Abruzzini
diane@rigoroustech.com
Rigorous
63 Harvey Road
Underhill, VT 05489
https://www.rigorous.co
(802) 318-1422
Any opinions, findings, conclusions, or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the view of the U.S. Department of Agriculture or SARE.